Skip to content
  • GeM
  • Bid status
  • Apply & bid

GeM bid status: how to check your tender result (and read it)

How to check GeM bid status from the seller dashboard, what each evaluation status means, how to see the published result with competitors' prices, and how to use it.

To check your GeM bid status, log in to your seller account on gem.gov.in, open the Bids tab on the dashboard, click My Bids, and select the bid ID you participated in. The current stage shows against the bid, and once evaluation is complete a View Bid Result option appears with the full outcome — who qualified, who didn’t, and what everyone quoted.

That’s the whole answer to the search query. But the status screen raises more questions than it answers — what “Under Technical Evaluation” actually means, how long each stage takes, and what to do with the result once it’s out. That’s the useful part, so let’s go through it.

One note before we start: GeM changes these screens often. The labels and menu names below are accurate as I write this, but verify on the portal — if a button has moved, the sequence underneath is still the same.

Where exactly do I check my bid status?

Two routes, depending on whether you want your own bids or someone else’s.

Your own bids, logged in. Seller dashboard → Bids → My Bids. Every bid you’ve participated in is listed with its current status. Click into a bid ID for the detail, and once the result exists, View Bid Result shows the evaluation outcome.

Any bid, without logging in. GeM publishes results publicly on bidplus.gem.gov.in — there’s a bid results section where you can search by bid or RA number. Anyone can look. This matters more than it sounds, because it means you can study results for bids you never participated in. More on that below.

If you’re still fuzzy on how the bid process itself runs — publication, participation, opening — I’ve covered that in the GeM bidding process explained. This post picks up after you’ve submitted.

What does each bid status actually mean?

The statuses run in a fixed sequence, and each one tells you exactly where the buyer’s committee is.

StatusWhat’s actually happeningWhat you should do
Not EvaluatedBuyer hasn’t opened or finished the technical roundNothing. Wait.
Under Technical EvaluationCommittee is checking documents and specs against the bidKeep your phone reachable for clarifications
Financial EvaluationFinancial bids of qualified sellers are opened and rankedWait for the ranking
Reverse Auction (if applicable)Qualified L1–Lx sellers bid prices down liveParticipate — this decides the final price
Awarded / Contract issuedWinner decided, contract or PO generatedIf it’s you: check the contract terms and delivery clock

Under Technical Evaluation is where most of the waiting happens. The buyer is checking whether your documents, product specification, and eligibility claims match what the bid demanded. Most disqualifications happen here, and they’re usually mechanical — a missing document, an unsigned annexure, a spec mismatch. I’ve written about why bids get disqualified separately; the short version is that technical rejection is almost never about your price.

Financial Evaluation only includes sellers who cleared the technical round. In a two-packet bid, financial bids are opened separately — sometimes days or weeks after the technical result. The qualified sellers are ranked L1, L2, L3 by quoted price. If the bid includes a reverse auction, this ranking decides who enters the RA, and the RA decides the final price. I’ve covered RA strategy on GeM in its own post.

Awarded means the buyer has decided and the contract flows through the portal. Note that L1 alone doesn’t guarantee the whole order — purchase preference for MSEs and Make in India Class-1 suppliers can split quantities. The award, not the ranking, is the thing that pays you.

How long does evaluation actually take?

There is no fixed timeline, and anyone who quotes you one number is guessing. What I see in practice, working with sellers across categories:

  • A simple, single-item bid with few participants: technical evaluation often done within one to two weeks of opening.
  • Multi-item bids, big quantities, many participants, or multiple consignee locations: three to four weeks is normal, and longer isn’t rare.
  • The financial round after that: anywhere from same-day to weeks, because it’s a separate opening event on the buyer’s calendar.

Treat these as observed habits, not rules. The clock belongs entirely to the buyer’s evaluation committee. If a bid has sat at Not Evaluated for a month, nothing is wrong with your bid — the committee just hasn’t met. The only lever you have is a polite query through the portal’s communication channel, and honestly, it rarely moves anything.

What you should not do is stop watching. Clarification requests during technical evaluation come with short response windows, and missing one converts a live bid into a disqualification. Check My Bids a couple of times a week while anything is under evaluation.

How do I see the result and competitors’ prices?

Once the buyer completes evaluation and the result is published, the bid result page shows more than most sellers realise:

  • The technical evaluation result — every participating seller, and against each one, qualified or disqualified.
  • The financial evaluation — the qualified sellers ranked L1, L2, L3 and so on, with the price each one quoted.

Read that second point again. Your competitors’ quoted prices, by name, are published on the result. So are yours. This isn’t a leak — it’s how transparent public procurement is supposed to work, and it’s the most underused feature on the portal.

If you participated, the result is in My Bids → View Bid Result. If you didn’t, search the bid number on the public results section of bidplus. Either way, download or note the comparison while it’s in front of you.

Two caveats. First, only qualified bidders’ prices appear in the financial ranking — a disqualified seller’s price stays sealed in a two-packet bid. Second, where a reverse auction ran, the RA’s final prices are what decided the award, so read the RA outcome, not just the initial quotes.

How do I use past L1 prices to price my next bid?

This is where checking results stops being admin and starts being strategy.

Every closed bid in your category is a data point: what the buyer bought, what quantity, who won, and at what price. String ten or fifteen of those together and you have something close to a market rate card for your product — built entirely from public information.

The method I’d suggest, and the one that works for the sellers I deal with:

  1. Search closed bids in your exact category on the public results section, not just bids you entered.
  2. Record the L1 price per unit, the quantity, and the winner for each. Quantity matters — L1 on 10,000 units is a different animal from L1 on 50.
  3. Note the L1–L2 gap. A consistent 15% gap means there’s pricing room. A 1% gap means the category is a knife fight and you win on cost structure, not courage.
  4. Watch for repeat winners. If the same two sellers take everything, study their prices specifically — they are your real competition, not the whole participant list.
  5. Price your next bid against the pattern, not the single last result. One aggressive L1 might have been a clearance sale. Five in a row is the market.

If the L1 concept itself is new to you — how lowest-price evaluation works and where it does and doesn’t apply — start with L1 bidding explained, and for the fuller picture of how committees move from opening to award, see how tenders are evaluated and awarded.

The sellers who lose money on GeM aren’t usually the ones who quote high and lose bids. They’re the ones who quote blind, win at an unsurvivable price, and then have to deliver. Twenty minutes with past results before you price is the cheapest insurance the portal offers.

What happens after the result?

If you’re L1 and the award goes your way, the contract or purchase order is generated on the portal — that document, not the ranking, starts your delivery clock. Read the delivery period and consignee details the day it lands.

If you lost, the result page is your debrief. Disqualified technically? Fix the document or spec gap — it’ll recur otherwise. Qualified but beaten on price? Now you know the number to beat, and whose number it was.

Either way, the status check that started as anxiety about one bid should end as intelligence for the next one. That’s the habit worth building.

Frequently asked questions

Can I check a GeM bid result without logging in?

Yes. GeM publishes bid results publicly on bidplus.gem.gov.in — there's a bid results section where anyone can search by bid or RA number, no seller login needed. You'll see the technical qualification list and the financial ranking once the buyer has completed evaluation and the result is published.

How long does technical evaluation take on GeM?

There's no fixed rule. For a straightforward bid it commonly takes one to two weeks; multi-item bids, large quantities, or bids with many participants can stretch to three or four weeks or longer. The clock depends entirely on the buyer's evaluation committee, so treat any number as a habit, not a deadline.

Can I see my competitors' quoted prices on GeM?

Yes, once the financial evaluation is opened and the result is published. The bid result page lists the qualified bidders ranked L1, L2, L3 and so on, with their quoted prices. In a reverse auction, the final RA prices are what count. This is public information — use it.

What does 'Not Evaluated' mean on my GeM bid?

It means the buyer hasn't started or finished evaluating yet. Nothing is wrong with your bid. Buyers open technical bids after the closing date on their own schedule, and some sit for weeks. There's nothing to do except wait and check back.

What happens after I'm declared L1 on a GeM bid?

L1 is not the award. The buyer still has to issue the contract or purchase order on the portal, and purchase preference policies (MSE, Make in India) can affect the final split of the order. Watch your dashboard and email for the contract, and only start arranging supply once it's actually issued.

Why can't I see the financial result even though technical evaluation is done?

In a two-packet bid the financial bids of technically qualified sellers are opened separately, sometimes days or weeks after the technical result. If the bid went to a reverse auction, the final result comes only after the RA closes. Until the buyer opens and publishes the financial round, you'll only see the technical outcome.

Written by Ketul Shah

Ketul Shah is the founder of TrackTender and Anekant AI. He works with Indian SMEs that bid on government contracts and writes about GeM, e-procurement and how smaller suppliers can compete and win.

More about TrackTender →

Stop reading about tenders. Start winning them.

Pick your states and categories and get matching tenders on Telegram and WhatsApp.

Start tracking