Skip to content
  • Federal contracting
  • Thresholds
  • Set-asides

Micro-purchase and simplified acquisition thresholds, 2026

The federal micro-purchase threshold is $15,000 and the simplified acquisition threshold is $350,000. What each dollar line changes for you as a supplier.

As of November 2026, the federal micro-purchase threshold is $15,000 and the simplified acquisition threshold is $350,000. Both rose on October 1, 2025, from $10,000 and $250,000. A third number matters just as much to you as a supplier: $25,000, the value above which a proposed contract action must be posted on SAM.gov.

Say you sell office furniture, and you hear that a federal office in your town just bought about $20,000 worth of it from another dealer. You search SAM.gov every week and the purchase never showed up. That’s how the rules work at that size. The buy sat under the line where posting on SAM.gov is required, so the buyer picked a short list of firms to ask, and you weren’t on it.

Each of these dollar lines changes how a purchase is advertised, who may compete, and how long you get to respond. Once you know which side of a line a purchase falls on, you know where to look for it and how fast you have to move.

What are the federal dollar thresholds in 2026?

ThresholdAmountWhere it is setWhat it changes
Micro-purchase threshold$15,000FAR 2.101At or below it, no competitive quotes are required
Public displayOver $20,000 up to $25,000FAR 5.101Notice displayed in a public place or posted electronically
SAM.gov postingOver $25,000FAR 5.101Synopsis on SAM.gov, with exceptions
Simplified acquisition threshold$350,000FAR 2.101Up to it, simplified procedures and a default small business set-aside
Subcontracting plan$900,000, or $2 million for constructionSBAA large business winner needs a small business subcontracting plan

All figures are from the Federal Acquisition Regulation (FAR) on acquisition.gov and from Small Business Administration (SBA) pages, read on November 15, 2026. The micro-purchase and simplified acquisition thresholds have exceptions. Lower micro-purchase limits apply to certain construction and services, and higher limits apply to some contingency and emergency buying.

What happens at or below $15,000?

A purchase at or below the micro-purchase threshold is the lightest form of federal buying.

No competition is required

FAR 13.203 says micro-purchases may be awarded “without soliciting competitive quotations” if the contracting officer, or another authorized buyer, considers the price reasonable. No notice on SAM.gov is required.

What that means for you

  • You won’t find these purchases by searching SAM.gov.
  • The buyer chooses whom to call. Being known to the office that buys what you sell is the main route in.
  • The same FAR section says micro-purchases “shall be distributed equitably among qualified suppliers” to the extent practicable. That gives you, as a new supplier, a fair reason to ask for a turn.

A policy report from the think tank Third Way states that in fiscal year 2023 only 36 percent of purchases at or below the micro-purchase threshold went to small businesses. That figure was not traced to official data for this post, so treat that number as an indication.

What happens between $15,000 and $25,000?

This is a narrow band with its own rules, and it’s where the furniture order from the top of this guide fell.

  • The purchase is above the micro-purchase threshold, so the default small business set-aside applies.
  • It’s below the SAM.gov posting line. For actions expected to exceed $20,000 but not $25,000, FAR 5.101 requires the notice to be displayed in a public place or posted by electronic means.
  • Where a simplified purchase is not posted on SAM.gov, FAR 13.104 tells the contracting officer to consider soliciting at least three sources to promote competition.

The practical effect is that the buyer picks a short list of firms to ask. If you’re outside that list, you don’t see the request.

What changes above $25,000?

The posting rule

FAR 5.101 requires contracting officers to synopsize proposed contract actions expected to exceed $25,000 on the governmentwide point of entry. The FAR defines that as the single point where government business opportunities greater than $25,000 can be accessed by the public, located at SAM.gov.

Awards are published too. FAR 5.301 requires a synopsis of contract awards exceeding $25,000 that are likely to result in subcontracts, or that are covered by certain trade agreements.

The exceptions

FAR 5.202 lists cases where no synopsis is needed. These are the ones a small supplier meets most often:

  • Orders placed under an existing indefinite-delivery contract.
  • Purchases that a statute routes through another agency or a specific source, such as the SBA’s 8(a) program.
  • Urgent needs where the notice period would seriously injure the government.
  • Actions under an existing contract that was already synopsized.

$25,000 is the line where federal buying becomes visible. Below it, the buyer decides whom to ask.

What does the $350,000 threshold change?

The simplified acquisition threshold affects three things: who can compete, how the purchase is run, and how long you have.

A default set-aside for small business

FAR 19.502-2 says each acquisition of supplies or services valued above the micro-purchase threshold, and not over the simplified acquisition threshold, “shall be set aside for small business”. The SBA puts it in plain terms: contracts from $15,000 to $350,000 are automatically set aside for small businesses.

There’s one main condition. The set-aside does not apply if the contracting officer finds no reasonable expectation of offers from two or more responsible small businesses that are competitive in terms of fair market prices, quality and delivery. This test is widely called the rule of two.

Above $350,000 a set-aside is still possible. The contracting officer must set the acquisition aside when there is a reasonable expectation that at least two responsible small businesses will submit offers and that the award will be made at a fair market price.

Shorter, simpler procedures

FAR 13.003 tells agencies to use simplified acquisition procedures “to the maximum extent practicable” for purchases within the threshold. A request for quotations under these procedures produces quotes, and FAR 13.004 says a quotation “is not an offer” and cannot be accepted by the government to form a binding contract.

Response time

Size and typeMinimum response time under FAR 5.203
Over $25,000 and up to $350,000A “reasonable opportunity to respond”, set by the contracting officer
Commercial products and services over $25,000Same reasonable opportunity standard
Over $350,000, not commercialAt least 30 days
Research and development over $350,000At least 45 days

So the smaller the purchase, the less protection you have on time. If you sell in the $25,000 to $350,000 range, you need to see notices on the day they post.

Which thresholds matter once you are bidding larger work?

Two more lines come up as your contracts grow.

The first is the subcontracting plan. According to the SBA, non-construction contracts of $900,000 or more, and construction contracts of $2 million or more, need a small business subcontracting plan when awarded to a business that is not small. For a small firm, this is the size at which a large prime contractor takes on small business subcontracting commitments.

The second is award reporting. The SBA notes that agencies report each award over $25,000 to the Federal Procurement Data System, so your research into past awards is most complete above $25,000.

How often do the thresholds change?

A federal statute, 41 U.S.C. 1908, requires acquisition-related thresholds to be adjusted for inflation every five years. The latest adjustment took effect on October 1, 2025.

ThresholdBefore October 1, 2025From October 1, 2025
Micro-purchase$10,000$15,000
Simplified acquisition$250,000$350,000
Subcontracting plan floor$750,000$900,000

The $25,000 posting line still reads $25,000 in the FAR text checked for this post.

Two reasons to re-check before you rely on a number

  1. Old guides are still online. Many articles written before October 2025 quote $10,000 and $250,000.
  2. The FAR is being rewritten. Proposed rules revising large parts of the FAR, including the part on publicizing contract actions, were published in June 2026. A law firm summary notes that nearly all agencies have already adopted model deviations issued in 2025. An agency’s practice can differ from the text quoted here.

The current text is always at acquisition.gov. The page for each section shows the Federal Acquisition Circular number and its effective date. The sections cited in this post showed FAC 2026-01, effective March 13, 2026.

How to apply the thresholds to a notice

When you open a notice, find the estimated value or the procedure named in it, then ask three questions:

  1. Is it under $350,000 and marked as a small business set-aside? If you’re small under the notice’s NAICS code, you can compete.
  2. Is it a request for quotations or a request for proposals? The notice tells you which, and the two ask for different amounts of work.
  3. How many days are left? Below $350,000 there is no 30-day floor.

Sources

All sources were read on November 15, 2026.

Frequently asked questions

What is the federal micro-purchase threshold in 2026?

It's $15,000 as of November 2026. The Federal Acquisition Regulation raised it from $10,000 effective October 1, 2025. Lower limits apply to certain construction and services, and higher limits to some contingency and emergency purchases.

What is the simplified acquisition threshold in 2026?

It's $350,000 as of November 2026, up from $250,000 before October 1, 2025. Higher amounts apply to certain contingency, emergency and humanitarian operations.

At what dollar value must a federal contract be posted on SAM.gov?

Proposed contract actions expected to exceed $25,000 must be synopsized on SAM.gov, the governmentwide point of entry, unless an exception applies. Actions between $20,000 and $25,000 must be displayed in a public place or posted electronically.

Are contracts under $350,000 reserved for small businesses?

Generally yes. FAR 19.502-2 says acquisitions above the micro-purchase threshold and not over the simplified acquisition threshold shall be set aside for small business, unless the contracting officer does not expect offers from two or more responsible small businesses.

How often do these thresholds change?

A federal statute, 41 U.S.C. 1908, requires acquisition thresholds to be adjusted for inflation every five years. The most recent adjustment took effect on October 1, 2025.

Do federal buyers need quotes for purchases under $15,000?

No. FAR 13.203 allows micro-purchases without soliciting competitive quotations if the price is considered reasonable. The same rule says micro-purchases should be distributed equitably among qualified suppliers where practicable.

Written by Ketul Shah

Ketul Shah is the founder of TrackTender, a tender alert service that runs in India. These guides are researched from official U.S. sources, which are listed at the end of each one.

More about TrackTender →

Want this as a daily list?

TrackTender is not open in the United States yet. Join the waiting list and we will write once when it is.

Join the waiting list