# Bid deadline counter

> Free bid deadline countdown in IST. See the days, hours and working days left before a GeM or government tender closes, and whether an OEM authorisation (MAF) still fits.

- [Free tools](/tools/) /
- Bid deadline counter

# Bid deadline counter

Enter the bid end date and time from the tender. See how long you have in IST, how many working days that leaves, and which prep steps are already tight.

 Bid end date Time (IST)
 Use the bid end date and time printed in the tender. The link in your address bar updates, so you can share this countdown. Prep checklist **DSC valid.** Class 3 on CPPP and state portals; GeM also takes Aadhaar eSign. A new DSC takes a few days (eKYC and video verification). **EMD sorted.** None on GeM under ₹5 lakh. Above that, upload a scan with the bid and send the hard copy within 5 working days of bid opening, or claim the MSE or startup exemption. **OEM authorisation (MAF) requested.** 2 working days to 3 weeks depending on the OEM. See the fit below. **Documents matched** line by line against the bid's own list. Time left **Set a deadline** Enter the bid end date
 Deadline
 Calendar days left
 Working days left (Mon to Fri)

## Will an OEM authorisation arrive in time?

- Existing OEM, strong relationship2 to 4 working days
- Existing OEM, routine channel3 to 6 working days
- New OEM, first request1 to 2 weeks
- International OEM, regional HQ approval1 to 3 weeks

**Based on:** GeM GTC v1.29 (25 Mar 2026), e-bidding clause (10 clear days); MAF turnaround times from our OEM authorisation guide. Holidays not counted. The tender document always decides.

## How much time a GeM bid gives you

GeM's terms say a bid must stay open at least 10 clear days between publication and the last date for submission. Buyers can allow longer, and many use the minimum. Take out a weekend and the days before you found the tender, and the time left to prepare can shrink to four or five days.

The counter reads the deadline as Indian Standard Time and shows working days as well as calendar days, because banks, OEMs and certifying authorities mostly work Monday to Friday. Public holidays aren't counted, so take those off yourself.

## The slow documents

The OEM authorisation (MAF) is usually the slowest document. It takes 2 to 4 working days with a strong OEM relationship and 1 to 3 weeks for an international OEM that needs regional HQ approval. Request it the day you decide to bid. The counter marks which of those turnaround times still fit before your deadline.

A Class 3 DSC is mandatory on CPPP and the state eProcurement portals. It's issued on a USB token after eKYC and video verification and takes a few days. GeM also accepts Aadhaar eSign. Check that your DSC hasn't expired well before bid day.

On GeM there's no EMD under ₹5 lakh estimated value. Above that, non-exempt sellers upload a scanned copy with the bid and send the hard copy within 5 working days of bid opening. MSEs and DPIIT-recognised startups claim the exemption in the bid instead. The [EMD calculator](/tools/emd-calculator/) gives the amount.

## Read the full rule

- [How long are government tenders open? GeM bid timelines](/blog/how-fast-government-tenders-get-missed/)
- [MAF full form in tenders: meaning, format and how to get one](/blog/oem-authorization-maf-for-tenders/)

TrackTender sends a 9 AM digest of matching GeM tenders on Telegram and WhatsApp, with the deadline and EMD on every card.

 [Start for ₹30](/subscribe/)
 [All free tools →](/tools/)

 FAQ

## Common questions

 How many days is a GeM bid open?

GeM’s General Terms and Conditions say a bid must give at least 10 clear days between publication and the last date for submission. Buyers can allow longer, but 10 days is the floor and buyers often use it.

How long does an OEM authorisation (MAF) take?

Typically 2 to 4 working days with a strong OEM relationship, 3 to 6 working days through a routine channel, 1 to 2 weeks for a first request to a new OEM, and 1 to 3 weeks for an international OEM that needs regional HQ approval. Request it the day you decide to bid.

Do I need a DSC to bid on GeM?

A Class 3 DSC is mandatory on CPPP and the state eProcurement portals. GeM also accepts Aadhaar-based eSign. A DSC is issued on a USB token after eKYC and video verification, takes a few days, and expires, so check its validity before bid day.

Does the counter include public holidays?

No. Working days are counted Monday to Friday after today, in IST. Take off any public holidays that fall before your deadline.